Configure your MDS Master Station
|
 |
Order Code
MPRS9CRD9B3S2G11F1SNN
Estimated Manufacturing Lead Time
40 business day(s)
|
|
|
|
MDS Master StationOrder CodeMPRS9CRD9B3S2G11F1SNNEstimated Lead Time40 business day(s)
*NOTE: Please enter number of Units
| | Product |
| Radio Band |
| Radio Configuration |
| Radio |
| Slot 4 |
| Duplexer |
| Antenna Out |
| MGR Core |
| MGR IFC |
| GPS |
| Primary Power |
| Secondary Power w/ Redundancy |
| Regulatory |
| Safety |
| Model |
| Reserved 1 |
| Special Handling |
|
Special Options
*WHAT IS PROVIDED WHEN YOU PURCHASE A KELMAN INSTALLATION:
Unless otherwise agreed in writing by GE, the installation of a Kelman on-line monitor includes the following:
· One GE installation engineer to complete installation (Not to Exceed 8 hours per day or a maximum of two consecutive weekdays.)
· Travel Expense to the installation Site
· Lodging, and meals for the engineer to complete the installation (Not to exceed two consecutive weekdays)
· If more than two days required then an additional 1,600 $USD per day will be charged (Includes T&L)
· Connection and leak testing of the ¼” stainless steel tubing connecting the unit to the transformer.
· All ties and clamps required to securely affix the tubing to the transformer and structure.
· Any electrical connections within the on-line monitor.
· Clean up of all debris related to the installation
· The commissioning and initial test of the on-line monitor.
*WHAT IS PROVIDED WHEN YOU PURCHASE A KELMAN COMMISSIONING:
Unless otherwise agreed in writing by GE, the commissioning of a Kelman on-line monitor includes the following:
· One GE installation engineer to complete installation (Not to Exceed 8 hours per day or a maximum of two consecutive weekdays.)
· Travel Expense to the installation Site
· Lodging, and meals for the engineer to complete the installation (Not to exceed two consecutive weekdays)
· If more than two days required then an additional 1,600 $USD per day will be charged (Includes T&L)
· Connection and leak testing of the ¼” stainless steel tubing connecting the unit
· Any electrical connections within the on-line monitor.
· The commissioning and initial test of the on-line monitor.
Grid Solutions Terms & Conditions of Sale
|