Configure your 850 Feeder Protection System
|
 |
Order Code
850-E-P5-NN-G5-H-N-N-A-N-N-M-S-P-C-B-1E-C-N-A-4
Firmware Rev.:042X
Mod:
Estimated Manufacturing Lead Time
20 business day(s)
|
|
|
|
850 Feeder Protection SystemOrder Code850-E-P5-NN-G5-H-N-N-A-N-N-M-S-P-C-B-1E-C-N-A-4Estimated Lead Time20 business day(s)
*NOTE: Please enter number of Units
| | Firmware Rev. |
| Application |
| Phase Current - Slot J |
| Phase Current - Slot K |
| Ground Current |
| Power Supply |
| Slot B - I/O |
| Slot C - I/O |
| Slot F - I/O |
| Slot G - I/O |
| Slot H - I/O |
| Faceplate |
| Current Protection |
| Voltage Protection |
| Control |
| Monitoring |
| Communications |
| Advanced Communications Connector |
| Wireless Communication |
| Security |
| |
| Retrofit Kit |
| |
| Modifications |
|
*WHAT IS PROVIDED WHEN YOU PURCHASE A KELMAN INSTALLATION:
Unless otherwise agreed in writing by GE, the installation of a Kelman on-line monitor includes the following:
· One GE installation engineer to complete installation (Not to Exceed 8 hours per day or a maximum of two consecutive weekdays.)
· Travel Expense to the installation Site
· Lodging, and meals for the engineer to complete the installation (Not to exceed two consecutive weekdays)
· If more than two days required then an additional 1,600 $USD per day will be charged (Includes T&L)
· Connection and leak testing of the ¼” stainless steel tubing connecting the unit to the transformer.
· All ties and clamps required to securely affix the tubing to the transformer and structure.
· Any electrical connections within the on-line monitor.
· Clean up of all debris related to the installation
· The commissioning and initial test of the on-line monitor.
*WHAT IS PROVIDED WHEN YOU PURCHASE A KELMAN COMMISSIONING:
Unless otherwise agreed in writing by GE, the commissioning of a Kelman on-line monitor includes the following:
· One GE installation engineer to complete installation (Not to Exceed 8 hours per day or a maximum of two consecutive weekdays.)
· Travel Expense to the installation Site
· Lodging, and meals for the engineer to complete the installation (Not to exceed two consecutive weekdays)
· If more than two days required then an additional 1,600 $USD per day will be charged (Includes T&L)
· Connection and leak testing of the ¼” stainless steel tubing connecting the unit
· Any electrical connections within the on-line monitor.
· The commissioning and initial test of the on-line monitor.
Grid Solutions Terms & Conditions of Sale
|